Peak Builders & Roofers of Denver

Denver ADU Guide: Rules, Costs, ROI (2026)

|ADU Construction|12 min read|By Peak Builders Team

Denver has some of the most favorable Accessory Dwelling Unit (ADU) zoning in the country. The Denver Group Living Code (2019) + Chapter 38 allows ADUs by-right on most single-family lots. That means a 400-1,000 sq ft secondary dwelling in your backyard, garage, or basement can be permitted without a variance — transforming your property into a dual-income home or multi-generational compound. This guide covers Denver ADU rules, construction costs, and realistic ROI.

Denver ADU Rules (2026)

Who Can Build One

Most single-family and multi-family zones allow ADUs. Check your specific zone:

  • E-SU-B, E-SU-Bx, E-SU-B2, E-SU-B2x: ADU allowed
  • U-SU-B, U-SU-B2, U-SU-B-Cx: ADU allowed
  • S-SU-B2, S-SU-D, S-SU-Dx: ADU allowed

Find your zone via the Denver Online Zoning Map (maps.denvergov.org).

Types Allowed

Most Denver residential zones allow:

  • Detached ADU (DADU): separate structure in backyard
  • Attached ADU: new ADU built sharing wall with main house
  • Garage conversion: existing garage → living space
  • Basement ADU: legal basement apartment with separate entry + kitchen + bath

Some zones allow two ADUs (one detached + one basement for example).

Size Limits

  • Detached ADU: up to 1,000 sq ft in most zones
  • Attached: 650 sq ft or 35% of main house size, whichever is greater
  • JADU / basement conversion: up to 500 sq ft typically

Check your zone's specific size limit.

Setbacks + Placement

  • Rear setback: 5 ft minimum (detached ADU can be closer to lot line than main house in most zones)
  • Side setback: 3-5 ft
  • Height: 20-25 ft maximum depending on zone
  • Distance from main house: typically 10 ft minimum

Parking

Denver waived parking requirements for most ADUs in 2019. You don't need to add a parking space when building an ADU in most zones. Some specific zones still require it — verify before quoting.

Short-Term Rental

Denver requires a Short-Term Rental (STR) license to rent any property <30 days. Key rule: you must live on the property as your primary residence. You can rent out your ADU (or your main house) short-term, but not both simultaneously unless you're the primary resident of one.

License cost: ~$250/year + annual renewal.

For long-term rental (30+ days), no license required.

Historic Overlay

Wash Park, parts of Capitol Hill, Cherry Creek, and Country Club have LPC review. Detached ADUs in historic districts need approval — adds 2-4 months to permit + may require exterior design matching.

Cost Breakdown by ADU Type

Detached ADU (New Build, 600-900 sq ft)

Typical cost: $200,000-$350,000 turnkey

ComponentCost (700 sq ft)
Design + engineering + permits$20,000
Foundation + site prep$28,000
Framing (floor, walls, roof)$42,000
Windows + doors$12,000
Roofing$11,000
Exterior siding + paint$16,000
HVAC (mini-split, high-altitude adjusted)$14,000
Electrical (new sub-panel + rough + finish)$22,000
Plumbing (water + sewer + gas to main)$18,000
Insulation (R-21 walls, R-49 attic per Colorado code)$9,000
Drywall + paint$14,000
Flooring$10,000
Kitchen (full: cabinets, counter, appliances)$18,000
Bathroom (tub, shower, toilet, vanity)$12,000
Interior doors + trim + hardware$6,000
Labor + GC$28,000
Total$280,000

Garage Conversion ADU

Typical cost: $120,000-$220,000

  • Insulation upgrade, drywall, new flooring: $20-30k
  • New kitchen + bath: $30-45k
  • Electrical/plumbing upgrades: $15-25k
  • HVAC: $8-14k
  • Exterior modification (new door/windows): $10-20k
  • Labor + permits: $30-50k

Timeline: 4-7 months.

Basement ADU (Legal Basement Apartment)

Typical cost: $80,000-$180,000

  • Framing + partition walls: $15-25k
  • Egress windows (typically 2 for bedrooms): $12-18k
  • New kitchen: $18-30k
  • Bathroom: $12-18k
  • Electrical/plumbing: $15-25k
  • HVAC (separate zone or mini-split): $8-15k
  • Labor + finish: $15-30k

Timeline: 4-8 months.

ROI Analysis

Rental Income Denver 2026

  • Detached 700 sq ft ADU: $1,600-$2,200/month
  • Garage conversion ADU: $1,400-$1,900/month
  • Basement ADU: $1,200-$1,700/month

ROI Math (Detached ADU example)

  • Construction cost: $260,000
  • Monthly rental: $1,900
  • Annual gross: $22,800
  • Operating expenses (maintenance + insurance + property tax on added assessed value): ~$5,500/yr
  • Net annual: $17,300
  • Simple payback on rental: 15 years
  • Appraised value added: $200,000-$260,000
  • Equity add: $0-$50k depending on neighborhood

Bottom line: ADUs are NOT get-rich-quick investments. They're long-hold assets that pay back over 15+ years + add significant value + provide flexibility.

When ADU ROI Is Better

Basement ADU has the best ROI because construction cost is much lower ($100k) vs rental income is similar ($1,500/mo). Payback: 7-8 years.

Dual use — Living in the ADU yourself while renting the main house. Can be tax-advantaged.

Multi-generational — Adult kids, aging parents. ROI is lifestyle flexibility not rental income.

Pro Tips

  1. Soil test before buying the land if you're shopping for ADU-ready lots. Denver soil varies — some Lakewood, Wheat Ridge, and Jefferson County pockets have Pierre Shale that requires engineered foundations (+$15-25k).

  2. Run the rental pro forma with realistic numbers. Don't assume top-of-market rent; assume 90% occupancy.

  3. Decide short-term vs long-term rental at design. Short-term has higher gross but different furniture, higher turnover cost, STR license rules. Long-term is lower gross but much less work.

  4. Know the neighborhood appraisal ceiling. In very high-end neighborhoods (Cherry Creek North, Observatory Park), ADUs add less to appraised value because the neighborhood is already at market top.

  5. Build for 10+ year hold. Short holds don't realize ADU ROI.

Getting Started

Free on-site feasibility consultation covers:

  • Zone check
  • Lot size + setback feasibility
  • Utility connection assessment
  • Preliminary design options (detached vs garage vs basement)
  • Permit timeline + cost estimate
  • ROI pro forma

Peak Builders Denver has built 25+ ADUs since 2019. Licensed Colorado GC, 5-year workmanship warranty, full Denver Ch. 38 permit handling. Call (720) 772-7567 for a free consultation.

Ready to Start Your Project?