# Peak Builders Denver — Complete Guide > Home Remodeling Contractor Denver. BBB A+ rated, licensed and insured general contractor. ## Company Overview Peak Builders Denver serves homeowners across Denver Metro. We specialize in residential roofing and construction, delivering quality craftsmanship with transparent pricing and reliable timelines. ### Quick Facts - GAF Master Elite, Owens Corning Platinum Preferred, and CertainTeed credentialed - Licensed, bonded, and insured general contractor - Service Area: Denver Metro - Rating: 4.9/5 stars (85+ reviews) --- ## Roofing Services ### Services Included - Roof replacement (shingle, tile, flat) - Roof repair - Tile roof restoration - Storm damage restoration - Gutter installation - Roof ventilation ### Roofing Materials - Asphalt shingles: 20–30 year lifespan - Architectural shingles: 30–50 years - Clay tile: 50–100 year lifespan - Concrete tile: durable and cost-effective - Flat roofing: commercial and modern residential ### Materials & Specifications - Asphalt shingle: GAF Timberline HDZ, 30-year wind warranty, Class A fire rating, StainGuard Plus algae protection - Architectural shingle: dimensional profile, 130 mph wind rating with proper installation, available in 20+ shades - Concrete + clay tile: Eagle / Boral profiles, 50–100 year lifespan, hurricane clip required in coastal zones - Standing-seam metal: 24-gauge Galvalume or Kynar 500, 50-year paint warranty, 140 mph wind uplift - Underlayment: synthetic + ice-and-water shield at all valleys, eaves, and penetrations - Ventilation: ridge vent + soffit vent system sized to attic CFM (1 sq ft NFA per 150 sq ft attic floor) ### Process & Timeline 1. Free 60-minute roof inspection (drone + interior attic) 2. Written line-item proposal within 48 hours 3. Permit pulled with the city (1–3 days) 4. Material delivery 1 day before tear-off 5. Tear-off + dry-in same day for most homes 6. New install 1–3 days, tile 4–6 days 7. Final cleanup with magnet sweep + city inspection ### FAQs Q: How long does a roof replacement take? A: 1–3 days for most residential roofs, 3–5 days for larger or tile roofs. Q: Do I need a permit for roof replacement? A: Yes. We handle all permits and inspections. --- ## Kitchen Remodeling ### Services Included - Custom cabinet design and installation - Countertops (granite, quartz, marble) - Kitchen islands - Appliance installation - Lighting (recessed, under-cabinet, pendant) - Flooring (hardwood, tile, LVP) - Backsplash installation - Custom pantry design ### Materials & Specifications - Cabinetry: framed (American) or frameless (European) custom or semi-custom; soft-close hinges + drawer slides standard - Counters: quartz (engineered, non-porous), quartzite (natural, harder than granite), butcher block, sintered stone - Backsplash: porcelain large-format, handmade ceramic, mosaic glass, slab quartz waterfall - Flooring: engineered hardwood, LVP (waterproof), porcelain tile (large-format) - Lighting: layered design — recessed (general), under-cabinet (task), pendant (accent), toe-kick (ambient) - Plumbing: 18-gauge undermount stainless or fireclay apron sinks, pull-down faucets, garbage disposal, instant hot water (optional) - Appliances: induction or gas range, counter-depth refrigerator, panel-ready dishwasher, ventilation hood sized to BTU output ### Process & Timeline 1. Design consultation + measure (90 min on-site) 2. 3D rendering + line-item scope (1–2 weeks) 3. Selections appointment at our showroom (cabinets, counters, finishes) 4. Permit + structural review if walls move (2–3 weeks) 5. Demo (3–5 days) 6. Rough plumbing/electrical/framing (1–2 weeks) 7. Drywall + paint (1–2 weeks) 8. Cabinets, counters, tile, fixtures (3–4 weeks) 9. Final inspection + punch list Standard refresh: 6–8 weeks on-site. Full gut with structural changes: 10–14 weeks on-site. --- ## Bathroom Renovation ### Services Included - Walk-in shower installation - Bathtub replacement - Shower-to-tub conversions - Vanity installation - Waterproof flooring - Lighting, toilets, ventilation ### Materials & Specifications - Walk-in shower: curbless or low-curb, linear drain, niche shelves, frameless 3/8" tempered glass, anti-slip floor tile (DCOF ≥ 0.42) - Tub: drop-in alcove, freestanding soaker, walk-in for accessibility - Vanity: 32"–84" widths, integrated quartz top or vessel sink, soft-close drawers, blade-pull hardware - Tile: large-format porcelain (12x24, 24x48), heated floor option (in-slab or under-tile mat with thermostat) - Lighting: vanity sconces (3000K), recessed shower light (wet-rated), exhaust fan with humidity sensor (110+ CFM) - Plumbing: pressure-balanced thermostatic valves, rain shower head + handheld combo, comfort-height toilets ### Process & Timeline - Powder room: 2–3 weeks on-site - Standard hall bath: 4–5 weeks on-site - Primary suite: 5–7 weeks on-site - Permit lead time: 1–2 weeks (plumbing relocation triggers structural review) --- ## ADU Construction ### ADU Types - Detached ADU, Attached ADU, Garage Conversion, Basement ADU ### Code & Permitting - California: SB 9 + AB 2221 streamline ADUs statewide; 60-day permit clock; no owner-occupancy requirement; up to 1,200 sq ft detached - Colorado / Denver Aurora: zoning code allows JADUs and detached ADUs in most single-family zones; ARC (HOA) review required where applicable - Egress windows required in any habitable basement room - 1-hour fire-rated assemblies between primary dwelling and attached ADU - Separate utility metering optional (helps with rental management); shared service permitted with sub-meter ### Timeline - Garage conversion: 3–4 months - Basement ADU: 2–3 months - Detached ADU: 6–9 months (including permits) --- ## Home Additions ### Addition Types - Room addition, second story, bump-out, sunroom, garage addition, in-law suite ### Structural & Code - Foundation: concrete spread footing or stem-wall to local frost depth (Denver: 36"; San Diego: 12"–18") - Framing: 2x6 exterior walls (R-19 cavity + continuous exterior insulation) - Energy code: California Title 24 / Colorado IECC 2021 — high-performance windows (U-0.30, SHGC ≤ 0.25), ducted heat-pump HVAC - Roof tie-in: structural connection engineer-stamped where rafter bearing changes - Permit lead time: 4–8 weeks city-dependent; second story may require neighborhood notification --- ## Contact Information **Peak Builders Denver** 2727 Bryant St, Suite 230, Denver, CO 80211 Phone: +1-720-605-7785 Email: info@peakbuildersdenver.com **Hours:** Monday–Thursday: 9:00 AM – 7:00 PM Friday: 9:00 AM – 5:00 PM Saturday–Sunday: Closed --- ## Financing Options - 0% APR promotions for qualified buyers - Home improvement loans - HELOC utilization guidance - No money down available - Flexible terms (12–180 months) Approval typically takes 24–48 hours. --- ## Warranty - Workmanship: 5 years - Materials: manufacturer warranties apply - Structural: 10 years on additions/new construction - Roofing: up to 50 years (material dependent) --- ## Why Choose Peak Builders 1. **Expertise**: GAF Master Elite, Owens Corning Platinum Preferred, and CertainTeed credentialed 2. **Quality**: 4.9/5 from 85+ reviews 3. **Trust**: BBB A+, licensed and insured 4. **Transparency**: Detailed estimates, no hidden fees 5. **Communication**: Dedicated project manager 6. **Warranty**: Industry-leading coverage 7. **Innovation**: AI-powered design visualization --- *This document updates daily. For the most current information, visit https://peakbuildersdenver.com*